Scope of Work:
Design drawings for the pipeline and stations of EPC-GPP2 package. Specifically as follow:
• An onshore pipeline and facilities: 30” Onshore dry gas pipeline is
approximate 30 km, from Dinh Co GPP2 to Gas Phu My Distribution Central
(GDC), includes
- Line blocks valve station (LBV) at Phuoc Hoa.
- Phu My GDC expansion: Only pig receiver, metering skid and tie-ins.
- 6” liquid product pipelines approximate 25 km with 03 LBVs and pig
receiver transport LPG from Dinh Co GPP2 to Thi Vai Terminal
- 10” liquid product pipelines approximate 25 km with 03 LBVs and pig
receiver transport Condensate from Dinh Co GPP2 to Thi Vai Terminal
Requirements:
- Have Degree or certificate comply with the assigned work.
- Have at least 15 years experience in designing Oil & Gas industry, Petrochemical and related industries.
- Have involved in the similar position and successful completed at least 2 similar projects. |