{ -
On
2:35 AM
- 0
}
ENGINEERING JOBS
Please
click below link for details key responsibilities and requirements.
Interested applicants who fully meet the above requirement are
encouraged to send your CV in English with one recent photo (max. 150KB)
to
www.jobstreet.com/id/inpex
All application will be kept strictly confidential.
INPEX home page:
http://www.inpex.co.jp/english/
The
Abadi field is a large gas discovery located some 350 km east of Timor
Island in Indonesian waters and 350 km north of Darwin, Australia. It
lies adjacent to the northern international boundary with Australia, in
400–800 m water depth. The Masela Production Sharing Contract (PSC) was
awarded to INPEX Masela as Operator with 100% interest in November
1998. The discovery well, Abadi-1, was drilled and completed in late
2000. INPEX has been planning for the development of the field through
application of a 2.5mmtpa Floating LNG installation for a Stage 1.
The project is starting the FEED (Define) Phase of the Stage 1 FLNG Development, whereby the SURF FEED will be performed by a single Contractor and the FLNG FEED will be a design competition between two Consortia with the successful FEED Consortia proceeding through to EPC of the FLNG facility.
The Full Field Development (FFD) is to enter into Concept Select Phase during 2012 which will entail formation of a Full Field Development Team and implementation of Offshore/Onshore Surveys and Concept Select Consultancy Contracts for screening of multiple development options, including large scale FLNG.
The project is starting the FEED (Define) Phase of the Stage 1 FLNG Development, whereby the SURF FEED will be performed by a single Contractor and the FLNG FEED will be a design competition between two Consortia with the successful FEED Consortia proceeding through to EPC of the FLNG facility.
The Full Field Development (FFD) is to enter into Concept Select Phase during 2012 which will entail formation of a Full Field Development Team and implementation of Offshore/Onshore Surveys and Concept Select Consultancy Contracts for screening of multiple development options, including large scale FLNG.
Head of Onshore LNG
Jakarta Raya
Jakarta Raya
Responsibilities:
- Manage all the onshore LNG engineering work for the Full Field Development of Masela Asset
- Manage all Onshore LNG related Concept Select Engineering Studies
- Manage onshore/nearshore surveys
- Manage the facilitation in the development process of Level 1, 2 and 3 project schedule for the range of development options of Masela Asset Full Field Development
- Manage the team and consultant and survey contractors
- Plan, execute, monitor, and control annual work plan and budget
- Manage HSE issues related to Onshore LNG engineering
- Manage the documentation and project progress reporting for Onshore LNG processes
- Manage all the interfaces with other departments/units
- Manage the economics evaluation of onshore LNG options
- Manage execution of IVAS Assurance activities by leading interaction
Requirements:
- Qualification & Work Experience Requirements:
- Bachelor in engineering or Technical Science
- Minimum 18 years in hydrocarbon and/or oil & gas industry with at least 5 years in a managerial position for engineering work related to onshore LNG Facilities, project planning, integration and management. Should have a minimum of 10 years engineering and installation experience in onshore gas production facilities
- Competencies
- Ability to develop a professional working relation with colleagues, supervisor and Stakeholders
- Ability to lead and demonstrate the highest HSE Behaviors
- Ability to work harmoniously in a diverse multicultural work environment with good communications skills
www.jobstreet.com/id/inpex
All application will be kept strictly confidential.
INPEX home page:
http://www.inpex.co.jp/english/